Understand the application.
Input materials
Prepare a solid billet for its next operation
This furnace heats billets and ingots that will subsequently be rolled, forged or formed. It is not a continuous casting machine and does not turn molten steel into billets. Identify the steel type and the physical section entering the heating stage, including its condition on arrival.
Match the heating task to billet movement
A billet-heating arrangement needs to fit the way workpieces arrive and move to the next machine. Provide typical billet dimensions and explain whether material is handled individually or as part of a production sequence. Specify the required heating task and the receiving operation rather than selecting equipment only by a power figure.
Define the boundary with the rolling or forging equipment
Discuss loading, discharge and transfer space alongside the selected power-supply requirements. Where the furnace is being added to an existing line, identify the entry condition and the timing needed by the rolling or forging stage. Keep the heating package, site supply and downstream machinery as separately identified responsibilities in the proposal.
Specifications & configurations.
Specification and Technical Parameter
| Model | MF Power | Input Voltage | DC Current | MF Frequency |
|---|---|---|---|---|
| KGPS-400 | 400kw | 380V | 800A | 1KHZ |
| KGPS-500 | 500kw | 380V | 1000A | 1KHZ |
| KGPS-750 | 750kw | 380V, 660V | 1500A, 850A | 0.8KHZ |
| KGPS 1000 | 1000kw | 380V, 660V | 2000A, 1140A | 0.8KHZ |
| KGPS-1500 | 1500kw | 380V, 660V | 3000A, 1700A | 0.5KHZ |
| KGPS-2000 | 2000kw | 660V, 1250V | 2273A, 1212A | 0.5KHZ |
| KGPS-2500 | 2500kw | 660V, 1250V | 2840A, 1515A | 0.5KHZ |
| KGPS-3500 | 3000kw | 660V, 1250V | 4000A, 2100A | 0.5KHZ |
Before you decide
Does this furnace produce steel billets from molten metal?
No. Its task is heating solid billets or ingots. Converting molten steel into billets is the task of continuous casting equipment.
What information helps connect it to a rolling mill?
Provide billet material and section, incoming condition, handling arrangement and the required delivery to the mill. Include the existing equipment and site electrical information.