Recycling, thermal processing & metal forming equipment
sales@miraclemachineryco.com+86 17329416874
Induction Heating Furnace

Closed Water Cooling Tower

The closed water cooling tower serves the circulating-water cooling requirements of furnaces and industrial equipment. Its closed-loop arrangement is a configuration choice for the connected process, not a melting machine. Selection should address cooling duty, water conditions, circulation and the equipment connection points.

Cooling water
Soft water
Cooling water quantity
10T-80T
Control mode
intelligent control

Select a configuration to include it in your enquiry.

MATERIAL & APPLICATION

Understand the application.

Cooling equipment for a defined water circuit

The tower removes heat from a circulating-water system serving connected industrial machinery. It can be discussed alongside a furnace or other process equipment requiring cooling, but it does not perform melting, heating or casting. Identify which water circuit it will serve and the equipment connected to that circuit.

Keep the closed-loop requirement explicit

A closed circulating-water arrangement should be considered against the connected equipment requirements and the water available at the site. Ask which circuit remains enclosed, how heat rejection is arranged and what water conditions are required. An open cooling tower is a comparison option, not an automatically interchangeable substitute for the same duty.

Coordinate circulation, controls and installation

Provide the connected heat load and required water conditions, together with existing pumps, tanks, pipework and controls where present. Confirm the selected tower configuration, supplied components and connection points. Space for airflow, service access and routing should be discussed in the site layout, rather than assuming that the tower footprint alone defines the installation.

TECHNICAL DETAILS

Specifications & configurations.

Specification and Technical Parameter

Specification and Technical Parameter
Modelm³/hKCAL./hNet weight(Kg)Dimension
ZXZ-N10T10500004502200*1050*2500
ZXZ-N15T15750005803200*1030*2600
ZXZ-N20T201000006803200*1030*2600
ZXZ-N30T301250007403400*1140*2600
ZXZ-N40T402000008803400*1140*2600
ZXZ-N50T5025000011003400*1400*2600
ZXZ-N60T6030000012503500*1400*2600
ZXZ-N70T7035000015003500*1720*2600
ZXZ-N80T8040000017003500*1720*2600
QUESTIONS & ANSWERS

Before you decide

Can a closed tower replace an open tower without other changes?

Confirm the water circuit, cooling duty and connected equipment requirements first. The circulation arrangement and site connections need to be reviewed before treating the designs as substitutes.

What should be specified with the tower?

Identify the heat load, required water conditions, circulation equipment and connection points. Separate supplied pumps and controls from the pipework and equipment already at the site.

RELATED EQUIPMENT

Compare equipment and connected stages

Open Water Cooling Tower — equipment view
Induction Heating Furnace

Open Water Cooling Tower

The open water cooling tower rejects heat through an open circulating-water arrangement for connected industrial equipment.…

Cooling water
Natural water
Cooling water quantity
6T-80T
View equipment
Induction Aluminum Melting Furnace — equipment view
Induction Melting Furnace

Induction Aluminum Melting Furnace

This induction furnace melts prepared aluminum charge for casting, ingot production or another receiving process. It is…

Melting body material
aluminum shell
Capacity
0.1-15T
View equipment
Induction Steel Melting Furnace — equipment view
Induction Melting Furnace

Induction Steel Melting Furnace

The induction steel melting furnace supplies molten ferrous metal for foundry or subsequent casting work. Selection starts…

Melting time
40-60min
Work power
100-10000kw
View equipment
PROJECT ENQUIRY

Discuss this equipment.

Share your material, production needs and site requirements. We’ll help you discuss a suitable equipment configuration.

Closed Water Cooling Tower

Provide an email, phone or WhatsApp number.
State the metal, charge capacity (kg) and required cycle.
10–6000 characters. Include your material and production requirements.

Your details are used to respond to this enquiry. Privacy policy

Equipment Discuss your project